Modern 2-bedroom flat in North Greenwich

4 people
2 bedrooms
1 bathroom
66 m2
2nd floor
Wi-Fi
Обставленная
StayProtection
Stay Benefits

Your stay in this accommodation will be covered by our StayProtection package with Stay Benefits included! Read more

Аренда квартиры - Лондон

Yacine D.'s avatar

On Flatio since August 2025

A superb modern two bed apartment situated in the sought after Millennium Village.

The spacious open plan living area, which comprises a high gloss kitchen with a range of designer appliances, leads directly out onto a large private balcony. There are fitted wardrobes to the principal bedroom, plenty of fitted storage to the hallway, a washing machine, a luxury bathroom suite, plus there are floor to ceiling windows which really enhance the natural light on offer. The apartment offers approximately 711 sq ft of living accommodation. Residents will also benefit from access to an on site 24h concierge.

Located within close proximity of the North Green Station (Jubilee Line) and the O2 Arena, providing a wide selection of bars and restaurants. A Co-Op supermarket and a pharmacy are located a short walk away, on Trathen Square. It is also within walking distance to Sainsburys, Aldi, Asda and Ikea. The development is home to an excellent primary school, nursery and Eco park. The apartment is next to the Thames path.

Скорость интернета для удаленной работы или развлечений

Download

100 Mbps

Upload

10 Mbps

Rooms & spaces

Bedroom 1
Not walk-through
  • 1 double bed
Bedroom 2
Not walk-through
  • 1 single bed
Ванная
  • Toilet
  • Sink
  • Bathtub
Зал
Also included Кухня

What this place offers

  • Internet (Wi-Fi)
  • Bedding
  • Electric heating
  • Washing machine
  • Dishwasher
  • Balcony
  • Fridge
  • Elevator
  • TV
  • Smoke detector , not available

Parking

-

Paid public parking nearby 5 minutes on foot

Где Вам предстоит жить

Метро
10 minutes
Общественный транспорт
5 minutes
Продукты
5 minutes
Главный ж/д вокзал
10 minutes
Бар
5 minutes
Ресторан
5 minutes
Аптека
5 minutes

About host

Yacine D.'s avatar

On Flatio since August 2025

View host profile
  • Neighborhood hero
  • Message response time: No data yet
  • Approval rate: No data yet
  • Booking response time: No data yet

Условия аренды

Политика отмены

Strict (30-days)

You can cancel the booking for free within 30 days before moving. Read more detailed .

Аренда и платы

rent per 30 days
3 867 €
Залог
0 €
Службы и интернет
в цене аренды
Плата за обслуживание

Доступно с

Мин. срок аренды

90 days

Maximal rent length

unlimited

Доступно с

Правила

Smoking not allowed
Pets not allowed
Parties not allowed
Suitable for children

Move-in and move-out

Move-in

Move-out

StayProtection for Guests

Every time you rent through Flatio, you're automatically covered by our StayProtection package.

  • Move-in Guarantee
    ensuring you'll always have a place to stay, even if everything doesn't go as planned
  • Balanced visa-friendly
    providing equal rights and adding great flexibility to your stay
  • Deposit-free policy
    eliminating the financial burden of hefty upfront deposits
  • 100% money protection
    which guarantees your transactions are always secure and free from scams
  • 7 days a week support
    that is here for you throughout your whole rental experience

Stay Benefits*

By booking this property, you'll also enjoy extended protection in the form of Stay Benefits - a unique offering backed by AXA! Here's what such packaging includes:

  • Liability insurance
    covering you in case you accidentally cause any damages
  • Assistance services
    for any potential issues during your stay, such as disruptions in internet service, utility faults (electricity, gas, heating), blocked-up door, or household appliance malfunctions

Availability of the listing

Check the available dates for this property
Это предложение меня заинтересовало!
In last two days, this listing has been seen by 40 people. Don't hesitate too long, it will soon be gone!
Final prices. You don't pay any hidden fees on Flatio. All utilities and Wi-Fi are already included in the rent.
Cancel for free. There is a Strict (30-days) cancelation policy for this listing.
Move-in Guarantee. We'll cover a back-up accommodation up to 7 days if the property is not alright.
Verified lease agreement. Read the lease online and comfortably from your home.

5 reasons why to choose this listing on Flatio

Никаких утомительных личных просмотров, стрессов и разочарований! Узнайте всё об аренде сейчас.
You get for the whole duration of your rent.
Еще перед бронированием Вы сможете прочитать целиком.
Оплата полностью безопасна. Мы зарегистрированы в Чешском национальном банке. Можете оплатить банковской картой.
По сравнению с риэлтором Вы сэкономите примерно10000 крон.

Часто задаваемые вопросы

About this listing

Public transport is 5 minutes by walk. Also check out the availability of other nearby services.
Yes, this housing has Wi-Fi.
The main station is 10 minutes away (using public transport). Also see the availability of other nearby services.
The minimum lease length is 90 days. See other conditions of rental.
The maximum lease length is not limited. See other conditions of rentals.

How Flatio works

Once you send a booking request, the host is notified that you are interested in their listing. From that moment, they have 24 hours to approve or reject your booking.

Hosts are mainly interested in the profile of their guest. Do not forget to fill in all necessary information, add your profile picture, or even make a short video about yourself. Doing that will make you more attractive for the owner and your booking will more likely get approved.

All the properties listed on Flatio must meet certain standards. We require fully furnished and equipped ones, dishes, cutlery and Wi-Fi included. In rare cases, a property may not offer Wi-Fi – this is always clearly stated on the listing page.
The duration of a medium-term rent is usually 1 to 12 months. Most of the hosts offer long-term rents or rents for just a few days, therefore getting a medium-term rent without Flatio is not that easy.

You can take a look at the contract in advance and online with every listing. After you sign it, you will find it in the application My Housing.

While arranging a contract on Flatio, you do not have to worry that it could be disadvantageous for you. Our contracts are made so that we avoid all problems! All of them are the same, used by all the hosts on Flatio.

Your time is precious. That's why we've added a virtual tour option to our platform so you can see some of the rentals listed on Flatio from the comfort of your own home.

If a virtual tour isn't available for the accommodation you've chosen, you can contact the host and ask them if they're willing to give you a personal tour of the rental unit.

Если вы заселились, а арендованное жилье не соответствует информации на Flatio, сообщите нам об этом как можно скорее!

Если условия для отказа соблюдены и арендодатель не может устранить проблему немедленно, у вас есть возможность расторгнуть договор аренды с полным возвратом денег. Мы также активно поможем вам найти альтернативное жилье и будем рядом с вами до тех пор, пока все не будет решено.

С условиями и всеми подробностями нашей Гарантии при переезде вы можете ознакомиться в этой статье нашего Справочного центра.

On Flatio, you have a variety of payment methods to choose from. You can use your card, payment gateway or bank transfer. Just pick the one which suits you the most.

How you can cancel a booking varies depending on what stage the booking is in.

Is your booking request still waiting for host approval? Then you can simply cancel it directly from your My Housing web app!

However, suppose the owner has already approved your booking request, and you are no longer interested in it. In that case, you can still cancel the booking before you sign the lease agreement. Just consider that you should do this only in essential cases. Because when the host accepts your booking, the property is stopped being advertised, and they can lose the chance to rent their property to someone else.

Do you have an approved booking and also a valid agreement? In order to cancel your booking, contact Flatio customer support well in advance of your contract beginning (the specific time and amount of refund depends on the type of cancelation policy).

Другие предложения, которые могли бы Вам понравится

Не расстраивайтесь, если эта квартира вам не подходит. У нас есть другие варианты. Flatio предлагает множество других квартир в аренду в Лондон, которые идеально подойдут вам. Ищете ли вы уютную студию или просторную квартиру, Flatio найдет для вас лучшее недорогое жилье в Лондон.

Самое приятное, что все они, по возможности, не требуют залога, имеют единый договор аренды, который защищает вас, а коммунальные услуги включены в стоимость, и нет никаких скрытых платежей, которые могли бы вас неприятно удивить.

Flatio также предоставляет вам подробные объявления, высококачественные фотографии, честные отзывы арендаторов и всю информацию, необходимую для принятия взвешенного решения. Итак, начните свой поиск сегодня и откройте для себя квартиры в аренду в Лондон с помощью Flatio.com.

6 Guest Heart of london 2 bedrooms
Available from 29 нояб. 2026 г.
3 383 € / 30 days
Все коммунальные услуги включены · No deposit
10% off!
Bright 2-Bed Terrace Flat, Kensal Green, NW10 2 bedrooms 77 m2 WiFi 71/18 Mbps
Available from 4 янв. 2027 г.
3 577 € 3 219 € / 30 days
Все коммунальные услуги включены · No deposit
15% off!
Industrial-Chic Flat in London Fields 1 bedroom 61 m2 WiFi 900/100 Mbps
Available from 4 дек. 2026 г.
4 302 € 3 656 € / 30 days
Все коммунальные услуги включены · No deposit
10% off!
Spacious Penthouse | Balcony, Parking + Workspace 2 bedrooms 100 m2 WiFi 500/500 Mbps
Available from 29 нояб. 2026 г.
4 611 € 4 150 € / 30 days
Все коммунальные услуги включены · No deposit
from 3 867 € / 30 days
Cookies settings on Flatio

We use cookies, including third-party cookies, to operate this marketplace with monthly stays. In addition to the operational ones necessary for the actual functioning of Flatio, we also use preferential, analytical, and marketing cookies. By clicking on Customise Cookies, you can decide on each category or refuse all cookies other than the basic ones. In addition, you can read detailed information on a particular page dedicated to the privacy of our visitors and clients.

You can change your cookie settings at any time and, of course, refuse all optional cookies if you prefer.